Clamp
Description:
Clamp, Railway Train components, Rail transit vehicle casting part, ADI casting part
Railway Train components Material:
ASTM A897M 1400-2
Weight:
7kgs
Application:
Rail and Train/Rail transit vehicle/
Keywords:
Clamp, Rail Train,High Speed train,Iron based shell sand casting, ADI, Austempered Ductile Iron
Foundry of Origin:
Hebei, China
Brand Name:
OEM
Process:
Iron based shell sand casting +Machining
Heat Treatment:
Austempering/Salt bath quenching
https://www.zen-young.com/train-railway-parts/clamp.html
Machining :
CNC +Drilling Machine
Procedures:
1. Incoming material inspection 2.Charge mixture 3.Moulding 4.Melting&Pouring 5.Shot blasting&grinding 6.Painting 7.Visual test 8.Machining 9.Process inspection 10.Cleaning 11.Leakage test 12.FQC 13.Packing&stocking 14.Pre-shipment inspection 15.Delivery
Tolerance:
+/-0.05mm( or according to the customers drawing indicated)
Inspection:
MT/UT/RT/100% Visual+100%gauge/CMM
Standard:
ASTM. AISI. DIN. BS. JIS. NF. AS.
Certification:
ISO9001/TS16949/ISO14001
Supply Ability:
1000 Ton/Tons per Month
Drawing:
Provide by customer, or design according as the sample,in the format of Pro/E, Auto-CAD, SOLIDWORK, CAXA, UG, CAD, CAM, CAE, STP, IGES, etc.
Mould :
Design and produced by ourselves according to provided drawings
More information you can click here
FAQs
1. How can I get the quotation?
Please send us your drawing together with the weight,material and quantity requireed.
2. If we don't have the drawing,can you make drawing for me?
Yes, we can scan your sample and make the drawing for your confirmation.
3. What kind of file format you can read?
PDF, IGS, DWG, STEP, etc.
4. How small and how big you can cast?
1kg~2000kg
5. What is the Rail transit vehicle casting part MOQ?
1pc
6. What is the sample and order lead time?
Sample time: 6-8 weeks including tooling construction. Order time: 4-6 weeks after sample approval, it can be flexible due to complexity or quantity.